Mediation would be sought before proceeding to binding dispute resolution (arbitration or litigation - whichever checkbox is selected in A101). Within 30 days from the date of the initial decision, either party can demand the other party file for mediation within 60 days of the initial decision. This question is based on reviewing the A201 commentary - link provided under CDS tab above. Thanks for your comments, I need to take a second look to make this stick - i'm testing soon! (comment corrected - don't know how to edit yet)
Which of the following forms of stone is irregular with a minimum of one good face and is used for ashlar veneers, curbs, sills, and copings? A. Monumental stone B. Rubble stone C. Dimension stone D. Rough stone Answer B. Rubble stone. ARE 4.0 exam prep: BDCS
Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors
10 days for the Architect to ACT, but 30 days from the date of filing the claim before the Owner or Contractor can request Arbitration.
ReplyDeleteMediation would be sought before proceeding to binding dispute resolution (arbitration or litigation - whichever checkbox is selected in A101). Within 30 days from the date of the initial decision, either party can demand the other party file for mediation within 60 days of the initial decision. This question is based on reviewing the A201 commentary - link provided under CDS tab above. Thanks for your comments, I need to take a second look to make this stick - i'm testing soon! (comment corrected - don't know how to edit yet)
ReplyDelete