Skip to main content

PPD-PDD

Reference materials related to Project Planning & Design and Project Development & Documentation exams:

Note that sometimes, NCARB will recommend not the latest version, but an earlier edition. Building codes are where this is perhaps important.



If you know of other good references, please share!

Disclosure  Policy

Comments

Try These Too!

C&D Debris

Which of the following materials are typically excluded from a state's legal definition of construction and demolition debris? Choose 3 A. Non-asbestos insulation, B. Asbestos tile, C. Roofing cement, D. Framing lumber E. Asphalt shingles, F. Drywall, G. Treated wood ties

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP

Reducing deflection in steel beams

To reduce the calculated deflection of a steel beam, choose one of the following strategies: A. select steel with a greater modulus of elasticity B. choose steel with a higher yield strength C. utilize a beam with greater moment of inertia D. utilize a beam with a greater section of modulus Answer C. utilize a beam with a greater moment of intertia ARE 4.0 exam prep: SS