Skip to main content

Basic services

Door and window details are first typically included in the deliverables of which basic service phase?
A. Schematic Design
B. Design Development
C. Construction Document
D. Bid Phase
E. Construction Phase

AnswerB. Design Development, in addition to fully dimensioned floor plans, sections and elevations, as well as outline material specifications.

ARE 4.0 exam prep: CDS

Comments

  1. I'm not sure I'm getting this. Door and Window details in my mind are squarely part of CD's.

    ReplyDelete
  2. Yes - true as well. The word "first" should be inserted before "included". The guide for this question is from an AIA Best Practices article found here: http://soloso.aia.org/eKnowledge/Resources/PDFS/AIAP026834?dvid=4294964851

    ReplyDelete

Post a Comment

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP