Skip to main content

Building setback

Which of the following determines building setback requirements (required minimum distances from property line to building)?
A. deed restrictions
B. building codes
C. bulk plane covenant
D. zoning regulations
AnswerD. zoning regulations
ARE 4.0 exam prep: SPD

Comments

Try These Too!

Fire-alarm & detection systems

In an atrium connecting 2 or more stories, what device types are generally required per section 907.2.13 of the International Fire Code (IFC)? Answer Fire alarm activated by automatic alarm, fire flow or manual alarm. Further, in Group A, E or M occupancies, emergency voice / alarm communication system is required per 907.2.12.2 (High-rise buildings). ARE 4.0 exam prep: BS

Plywood double-post!

Why are the plies in plywood turned at right angles in each successive layer? Answer This helps plywood panels to have a high degree of resistance to splitting. In this image, the panel consists of 3 plies. What is the name of each ply? Answer Face+Core+Face. In 5 or 7 ply panels, the core is sandwiched by crossbacks with a face and a back ply. ARE 4.0 exam prep: BDCS

Stone shape and usage

Which of the following forms of stone is irregular with a minimum of one good face and is used for ashlar veneers, curbs, sills, and copings? A. Monumental stone B. Rubble stone C. Dimension stone D. Rough stone Answer B. Rubble stone. ARE 4.0 exam prep: BDCS