Skip to main content

Radon

Remedial action should be taken if testing reveals a radon level over 4 pCi/L. Which 2 organizations issue standards for radon mitigation?
A. TSCA
B. EPA
C. NESHAP
D. ASTM
E. CPSC
F. NIOSH
AnswerB. EPA and D. ASTM (E2121).

Architect Registration Exam 4.0 study: BS

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP