Construction type

Fire-resistance rating requirements listed in IBC Table 601 list major building elements based on construction classification. Match these two criteria correctly, choose 2
A. Type IB = roof construction 1 1/2 hrs
B. Type IIB = exterior bearing walls 1 hr
C. Type IIIA = structural frame 1 hr
D. Type VB = floor construction 1 hr
E. Type IVHT = exterior bearing walls 2 hr

AnswerC. and E. are correct. HT = heavy timber.

ARE 4.0 exam prep: BDCS
Reference tip:  Find the online version of Table 601 in this discussion paper here

Comments

  1. Link takes you to a page not found, just thought I let you know.
    Thank you very much for all the useful information.

    ReplyDelete

Post a Comment

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Spec coordination

In case there is a discrepancy between specifications and the drawings, which takes precedence? Answer Neither, A201 considers these - quote - complementary and what is required by one shall be binding as if required by all.- unquote. ARE 4.0 exam prep: CDS

Shoring

A slurry wall is a narrow trench filled with a slurry mixture composed of bentonite clay and water, enabling it to resist pressure from the surrounding earth. What type temporary support is this? A. Bracing B. Sheeting C. Underpinning Answer B. It is a type of sheeting. ARE 4.0 exam prep: SPD