Construction type

Fire-resistance rating requirements listed in IBC Table 601 list major building elements based on construction classification. Match these two criteria correctly, choose 2
A. Type IB = roof construction 1 1/2 hrs
B. Type IIB = exterior bearing walls 1 hr
C. Type IIIA = structural frame 1 hr
D. Type VB = floor construction 1 hr
E. Type IVHT = exterior bearing walls 2 hr

AnswerC. and E. are correct. HT = heavy timber.

ARE 4.0 exam prep: BDCS
Reference tip:  Find the online version of Table 601 in this discussion paper here

Comments

  1. Link takes you to a page not found, just thought I let you know.
    Thank you very much for all the useful information.

    ReplyDelete

Post a Comment

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Zoning terminology

What is the term for the maximum three-dimensional space on a zoning lot within which a structure can be built, as allowed by applicable height, setback and yard controls? Answer Zoning envelope or building envelope.