Bid Validity

Why may an owner reject, or consider "unresponsive", a bid that proposes more than the requirements in the documents?



Answer:  To be valid, a bid must conform to the requirements of the advertisement, invitation to bid and instructions to bidders.

Visit the Construction and Evaluation page for more study resources

Comments

Try These Too!

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Soil Analysis

In sieve analysis, one of the first results measured is the % retained in each sieve of the total sample (W sieve / W total x 100%). If the illustrated sample indicates equal amounts of various sizes of aggregate, where most of the voids in such material will be filled with particles, which gradation term is used? A. Narrow gradation B. Gap gradation C. Dense gradation D. Open gradation E. Rich gradation