Closeout procedures

In closing out the project delivery process, what is the most likely claim if the architect does not prepare a final change order to adjust the contract sum when the cost of the work is more or less than the specified allowance?



Answer: A claim may contend that the final application for payment has been improperly certified by the architect.
are-review.blogspot.com

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Deflection: steel or wood

For EITHER steel or wood beams, a question that asks for the allowable deflection limit (maximum) for live loads only requires which of the following equations? A. L/240 B. L/360 C. ∆ = 5wl⁴ / 384EI D. ∆ = 5Wl³ / 384EI Answer B. L/360 or span in inches divided by 360. ARE 4.0 exam prep: SS Note on calculations: From posted discussions on AREforum , memorization of most equations is not advised. However, even when the equation may be available in in-exam reference, selection of the appropriate equation requires correct identification.

Townships double post!

How many sections are contained within a township? Answer 36 (each is 1 mile square) What are the dimensions of 1/2 of a township? H & W Answer 18 miles square (3x6 sections) ARE 4.0 exam prep: SPD