Regardless of contract format (AIA standard or other), the contract language must provide clear description of all of the following included in the base fee except: (Select 2)
A. major project milestone dates, B. scope of services, C. reimbursable expenses with respective unit billing rate, D. multiple review of submittals, E. physical and virtual building models, F. number of meetings with third parties included (authorities having jurisdiction, landlords)


Answer is D and E items are not included in the base fee, but should be identified and described as additional services in the contract.
are-review.blogspot.com

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP