Run-off


It has been determined that the calculated runoff of a site development will exceed the existing municipal storm sewer's capacity. What is the most likely solution to be proposed?
A. create a larger leach field
B. create a retention pond
C. create a detention pond
D. recalculate using a storm event period of smaller magnitude


Answer is C. create a detention pond, which serves as a temporary holding pond for the site runoff, until it drains at a controlled rate to the sewer system.

B. will hold the runoff indefinitely, A. is only applicable to a septic system, D. is set by local regulations and practice.
are-review.blogspot.com

Comments

Try These Too!

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred

Brick bonds

What distinguishes the English Bond pattern from the Dutch Bond pattern in this image? Answer In the English Bond, stretchers are aligned; In the Dutch (cross), stretchers move by a half each course (not aligned). ARE 4.0 exam prep: BDCS

Collector walks

Walks next to parking areas where vehicles are able to overhang the walk should be a minimum width. What is this minimum in feet? A. 3 feet B. 4 feet C. 5 feet D. 6 feet Answer These walks should be 6 ft (D.) minimum in width. ARE 4.0 exam prep: SPD