Document coordination

In coordinating the construction drawing set with the project specifications, the information provided in these two elements of the contract documents must NOT (choose 2)
A. correlate, B. duplicate, C. complement
D. overlap, E. coordinate, F. match


Answers B and D are correct.
The two documents should complement each other to form a complete set. Confusion and subsequently dispute with contractors arises from conflicting information, often the result of duplicated or overlapping content.
are-review.blogspot.com

Comments

Try These Too!

Townships double post!

How many sections are contained within a township? Answer 36 (each is 1 mile square) What are the dimensions of 1/2 of a township? H & W Answer 18 miles square (3x6 sections) ARE 4.0 exam prep: SPD

Parking units

What are the car stall dimensions for a compact car? Answer A compact car stall size can be set by each municipality and therefore varies. Generally it is 7ft 6in wide by 15ft 0in long. However, in Fresno CA it's 8 1/2ft x 16ft and according to an Iowa urban design manual, it's 7ft 6in by 16ft. ARE 4.0 exam prep: SPD

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%