A paving material in which a base surface of crushed stone or slag is compacted until smooth, then an asphalt emulsion is applied by spray and finally covered by fine aggregate, which is leveled by roller so that the smaller particles fill the remaining voids, is called which of the following:
A. Cold laid asphalt, B. Asphaltic concrete, C. Asphalt macadam, D. Granite setts, E. Porous concrete


Answer is C. Asphaltic macadam
are-review.blogspot.com

Comments

Try These Too!

Overimprovement

While underimprovement describes property that is not being put to its highest and best use (reducing its value), when does overimprovement apply?

Change in services

An owner may authorize a change in services for which a written scope of duties is attached to the owner-architect contract, to provide a higher degree of monitoring or observing work on site than expected under basic construction phase services for architect's site visits. What is this role and when does it occur?

Space programming

What are two common ways to identify and document physical and functional relationships amongst spaces in the programing phase? Choose 2 A. adjacency diagram B. adjacency matrix C. bubble diagramming D. block-stack diagram Answer A & B The adjacency diagram and adjacency matrix are used in programming stage, while C & D are employed as the initial design effort begins as more physical representations of plan are introduced. ARE 4.0 exam prep: PPP