Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors:
Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%


Answer: Gross building area (GSF) = 15,000 sf. Either factor can be used to find the answer - 10,000 x 1.5 = 15,000sf or 10,000 / 0.66667 = 15,000sf (+/-)
are-review.blogspot.com

Comments

  1. question about this...the answer to this question is the gross area, but the question seemed like it was asking something else. also, it looks like the space factor wasn't needed to answer this question. why?

    ReplyDelete
  2. Like many potential exam questions, the wording of this one includes superfluous information that is unnecessary to finding the answer. The question asks to find the gross building area from the usable area of the classrooms.

    ReplyDelete
  3. The calcs in the answer are incorrect. Using the Building Efficiency Ratio to calculate the Gross Sq Ft you have to divide 10,000 by .67 not multiply.

    ReplyDelete
  4. Thanks Joshua! I just updated the answer notation.

    ReplyDelete
  5. I really appreciate the site, I find the example questions very useful in reviewing for the ARE tests, when the answer is viewable.

    Is it just me, or when you hover over the Answer is some of the answer cut off or sometimes shows up blank all together?

    Let me know if there is something I should be doing differently...thanks!

    ReplyDelete
    Replies
    1. Hi Jason, very glad the site is useful to you. Some browsers don't seem to show the answers all the time. Try Firefox, Chrome, or Safari. Internet Explorer works if it's IE9 or later. Thanks for visiting!

      Delete

Post a Comment

Try These Too!

Bidding process

If the Owner would like to change the designated bid opening date and time contained in the Instructions to Bidders for the Owner's convenience, what procedure must be used? Answer

Tensegrity

A type of structure whose integrity is derived from the balance between members in tension and in compression is Tensegrity . Compressive components connected by tensile components to other compressive components form a tensegrity structure. What architect-engineer-cosmologist coined this term? Answer

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP