Skip to main content

US Survey System


The origin of the US survey system is which one of the following?
A. General Land Office's Instructions and Manuals series issued from 1851
B. Northwest Ordinance of 1787
C. Land Ordinance of 1785
D. Public Land Survey System 1850


Answer is C. Land Ordinance of 1785 is correct. Although the system originated following the Declaration of Independence, the method was detailed starting with (A.) the 1851 General Land Office's Instructions and Manuals.
are-review.blogspot.com

Read more about this method of land parcel identification here.

Comments

Try These Too!

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred

Roof pitch

Which one of the following slopes in this illustration corresponds with an 8:12 pitch roof? A. 45° B. 36.87° C. 33.69° D. 26.57°

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%