Retention pond



What is the period of time that a retention pond is intended to hold a specific amount of water?

A. 3 days
B. 5 days
C. drawdown period calculation required
D. indefinite

AnswerD. indefinite. By contrast, a detention pond is a temporary holding area, controlling flooding until the water slowly drains to another location.
ARE 4.0 exam prep: SPD

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP