Systems costs

In a small office building (20,000sf), what is a reasonable breakdown of mechanical and electrical systems by percentage of total budget (projected cost = $2.5 million)?

A. mech 10% / elec 5%
B. mech 15% / elec 10%
C. mech 20% / elec 10%
D. mech 10% / elec 10%

AnswerD. mech 10% / elec 10%. A typical small office building project allocates equal percentages on mechanical and electrical systems for a total of 20% of the projected costs.
ARE 4.0 exam prep: BS

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Overimprovement

While underimprovement describes property that is not being put to its highest and best use (reducing its value), when does overimprovement apply?

Construction type

Fire-resistance rating requirements listed in IBC Table 601 list major building elements based on construction classification. Match these two criteria correctly, choose 2 A. Type IB = roof construction 1 1/2 hrs B. Type IIB = exterior bearing walls 1 hr C. Type IIIA = structural frame 1 hr D. Type VB = floor construction 1 hr E. Type IVHT = exterior bearing walls 2 hr Answer C. and E. are correct. HT = heavy timber. ARE 4.0 exam prep: BDCS Reference tip:  Find the online version of Table 601 in this discussion paper here