Skip to main content

System voltage

In this diagram, if the first load is a 120V computer, what is the second load shown?
A. single phase transformer, 480/120-240V
B. 208V 3-phase motor
C. 208V heater, single phase
D. 277V discharge fluorescent lighting

AnswerC. 208V heater, single phase. Neutral to any single panel bus = 120V. A load connecting two panel buses (not neutral) is 208V single phase; between three panel buses is 208V 3-phase. Since the computer is 120V, system voltage cannot be 277/480.
ARE 4.0 exam prep: BS

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Spec coordination

In case there is a discrepancy between specifications and the drawings, which takes precedence? Answer Neither, A201 considers these - quote - complementary and what is required by one shall be binding as if required by all.- unquote. ARE 4.0 exam prep: CDS

Shoring

A slurry wall is a narrow trench filled with a slurry mixture composed of bentonite clay and water, enabling it to resist pressure from the surrounding earth. What type temporary support is this? A. Bracing B. Sheeting C. Underpinning Answer B. It is a type of sheeting. ARE 4.0 exam prep: SPD