When should the contractor submit his qualification statement (A305)?
A. As part of the bidding procedures
B. After award of bid
C. Before the first kick-off meeting
D. After executing the contract

AnswerEither A or B. If this wasn't specified to include in the bid submissions, then the contractor's qualification statement would be required after the award of the bid.
ARE 4.0 exam prep: CDS

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Vapor retarders

In this section, a ceiling assembly separates the attic space above from the room interior below. If the building is located in Lewisville, Texas (hot-humid zone), where is the predicted location of condensation and what is the predicted condition of the gypsum board in this assembly? (Select 2 from the following) A. outside face of vapor retarder B. inside face of vapor retarder C. gypsum board will be wet D. gypsum board will be dry