Skip to main content

Zoning ordinances


The noted items in this sketch are located within a required setback and are sometimes excluded from zoning requirements as exceptions or allowances. Which of these is considered an allowable accessory? (Choose 2)
A. roof overhang
B. low-level deck
C. fence
D. balcony

AnswerB. low-level deck and C. fence are accessory structures (like a detached garage or other structure). The other two are projections.
ARE 4.0 exam prep: SPD

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP