What is the MasterFormat 2004 division for earthwork specifications, whose subsections include site clearing, earth moving, shoring, underpinning, excavation support, special foundations, tunneling?
AnswerMasterFormat 2004 Division 31 contains earthwork, which in previous editions was found in Division 2
ARE 4.0 exam prep: CDS
AnswerMasterFormat 2004 Division 31 contains earthwork, which in previous editions was found in Division 2
ARE 4.0 exam prep: CDS
Comments
Post a Comment