Work estimating

When allocating work by project phases, which of the following is a typical estimate breakdown into
Schematic Design, Design Development, Construction Documents, Bidding&Negotiation, Contract Administration

A. SD 10%, DD 10%, CD 50%, BN 10%, CA 20%
B. SD 15%, DD 20%, CD 40%, BN 5%, CA 20%
C. SD 5%, DD 30%, CD 30%, BD 5%, CA 30%
D. SD 10%, DD 20%, CD 35%, BD 15%, CA 20%

AnswerB. SD 15%, DD 20%, CD 40%, BN 5%, CA 20% is a typical allocation.

ARE 4.0 exam prep: PPP

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP