Forms: G704/DB

The form G704/DB "Acknowledgement of Substantial Completion" is used on design-build projects and is similar to the traditional G704 "Certificate of Substantial Completion". However, only the owner & design-builder signs this form. Why has the space for architect's signature dropped in this form?

AnswerTo eliminate a potential ethical conflict when the architect is a subcontractor to the design-builder, ensuring the architect is not pressured to sign off on a date that might trigger an early completion bonus or limit liquidated damages for late completion.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred

Roof pitch

Which one of the following slopes in this illustration corresponds with an 8:12 pitch roof? A. 45° B. 36.87° C. 33.69° D. 26.57°

Soil Analysis

In sieve analysis, one of the first results measured is the % retained in each sieve of the total sample (W sieve / W total x 100%). If the illustrated sample indicates equal amounts of various sizes of aggregate, where most of the voids in such material will be filled with particles, which gradation term is used? A. Narrow gradation B. Gap gradation C. Dense gradation D. Open gradation E. Rich gradation