Environmentally responsible design

B101-2007 incorporates a public policy of the AIA that architects must be environmentally responsible in performing their services. As part of the architect's basic services, an architect is required to discuss during schematic design phase the feasibility of including environmentally responsible design approaches in the project. In reviewing environmentally responsible design alternatives, the client agrees that energy modeling should be performed. How is this type of service classified?

AnswerThis should be identified in Article 4 as an additional service (extensive environmentally responsible design) for which additional compensation is required.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP