Why is the multiple of direct personnel expense method preferable when a client has no prior involvement or experience developing a project and has not yet settled on a program for it?
A. The client would achieve programming, a non-basic architectural service, without additional expense.
B. The architect would be compensated regardless of the additional time involved to deliver programming services.
C. This method promotes faster decision-making as the client will pay a fixed amount for a specific set of services.
D. This method is scaled to the cost of construction.

AnswerB is the best selection. Direct personnel expense is a variant of cost plus fee compensation and is primarily beneficial to the architect to cover its costs and profit.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Bidding process

If the Owner would like to change the designated bid opening date and time contained in the Instructions to Bidders for the Owner's convenience, what procedure must be used? Answer

Tensegrity

A type of structure whose integrity is derived from the balance between members in tension and in compression is Tensegrity . Compressive components connected by tensile components to other compressive components form a tensegrity structure. What architect-engineer-cosmologist coined this term? Answer

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP