Compensation

Why is the multiple of direct personnel expense method preferable when a client has no prior involvement or experience developing a project and has not yet settled on a program for it?
A. The client would achieve programming, a non-basic architectural service, without additional expense.
B. The architect would be compensated regardless of the additional time involved to deliver programming services.
C. This method promotes faster decision-making as the client will pay a fixed amount for a specific set of services.
D. This method is scaled to the cost of construction.

AnswerB is the best selection. Direct personnel expense is a variant of cost plus fee compensation and is primarily beneficial to the architect to cover its costs and profit.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Spec coordination

In case there is a discrepancy between specifications and the drawings, which takes precedence? Answer Neither, A201 considers these - quote - complementary and what is required by one shall be binding as if required by all.- unquote. ARE 4.0 exam prep: CDS

Shoring

A slurry wall is a narrow trench filled with a slurry mixture composed of bentonite clay and water, enabling it to resist pressure from the surrounding earth. What type temporary support is this? A. Bracing B. Sheeting C. Underpinning Answer B. It is a type of sheeting. ARE 4.0 exam prep: SPD