Skip to main content

Boiler & Machinery Insurance

Boiler and machinery insurance purchased by the Owner for such equipment required by the Contract Documents covers the insured objects during installation and until which of the following?
A. until expiration of the period for correction of Work
B. until 30 days' prior written notice by the Contractor
C. until application of consent from the insurance company
D. until final acceptance by Owner

AnswerD. until final acceptance by Owner. Article 11 of A201 describes the various types of insurance that may be required. See 11.3.2 for Boiler and Machinery Insurance.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Vapor retarders

In this section, a ceiling assembly separates the attic space above from the room interior below. If the building is located in Lewisville, Texas (hot-humid zone), where is the predicted location of condensation and what is the predicted condition of the gypsum board in this assembly? (Select 2 from the following) A. outside face of vapor retarder B. inside face of vapor retarder C. gypsum board will be wet D. gypsum board will be dry