Specifying sustainable materials

When specifying products that are new to the market on a sustainable building project, which of the following important factors is most likely to contribute to later claims by the contractor for increased overhead payment, lost profit in connection with delays to the schedule?
A. supplier availability
B. performance data
C. costs
D. installation requirements

AnswerA. availability - must be investigated before specifying as manufacturers will likely have prepared performance, pricing and installation data available, but the contractor's ability to procure the material in time more directly impacts the schedule.


ARE 4.0 exam prep: CDS

Comments

Try These Too!

Vertical louvers

On which elevations of a building are vertical louvers generally more effective? Select 2 A. East B. South C. West D. North Answer A. East and C. West (answer applies for northern hemisphere) ARE 4.0 exam prep: SPD

Friction loss

Friction loss or static head in sizing of air ducts is given in this expression of units: A. pounds per square inch B. inches of water per 100 feet C. inches of refrigerant per 100 feet D. inches of water per foot Answer B. inches of water per 100 feet ARE 4.0 exam prep: BS

Joint ventures

Which AIA document series includes agreements for joint ventures? A. A-series B. B-series C. C-series D. D-series E. G-series Answer C. C-series covers architect/consultant documents including joint ventures.