Skip to main content

Exit corridors

An alcove (recess) along an exit corridor partially accommodates the swing of a door opening onto the path of egress travel, reducing its clear width. When fully opened, what is the maximum projection of the door that is allowed into the corridor?

Answer7 inches maximum.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Overimprovement

While underimprovement describes property that is not being put to its highest and best use (reducing its value), when does overimprovement apply?

Change in services

An owner may authorize a change in services for which a written scope of duties is attached to the owner-architect contract, to provide a higher degree of monitoring or observing work on site than expected under basic construction phase services for architect's site visits. What is this role and when does it occur?

Space programming

What are two common ways to identify and document physical and functional relationships amongst spaces in the programing phase? Choose 2 A. adjacency diagram B. adjacency matrix C. bubble diagramming D. block-stack diagram Answer A & B The adjacency diagram and adjacency matrix are used in programming stage, while C & D are employed as the initial design effort begins as more physical representations of plan are introduced. ARE 4.0 exam prep: PPP