Skip to main content

Contracts audio lectures

Another Update, this time more Positive:
The lecture series given by Prof. Friedlander at UIC has been much referenced on ARE Forum, and it's applicable to at least CDS and PPP exams. Access to the full semester audio lecture is available on this link thru Prof. Friedlander's law firm site.   If you find them, then, with quicktime player you can adjust the playback speed under A/V controls. The lectures are each about 1:45 in length. In particular, 4 lectures cover the most current AIA A201 and B101 contracts in depth.
ARE 4.0 exam prep: CDS

Comments

Try These Too!

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors