BIM liabilities

Our legal system resolves practice and contract issues on a case-by-case basis - through litigation, setting precedents. What currently accepted version of legal concepts does reliance on BIM as a project deliverable call into question? (Choose two)
A. Severability
B. Privity
C. Repose
D. Agency
E. Standard of Care
AnswerB. Privity (shields architects from third party claims) and E. Standard of Care (perform services consistent with that level of skill and care ordinarily provided by architects practicing under the same or similar circumstances).

For further reading, see the AIA Best Practices article on this subject: Liability and BIM

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Spec coordination

In case there is a discrepancy between specifications and the drawings, which takes precedence? Answer Neither, A201 considers these - quote - complementary and what is required by one shall be binding as if required by all.- unquote. ARE 4.0 exam prep: CDS

Shoring

A slurry wall is a narrow trench filled with a slurry mixture composed of bentonite clay and water, enabling it to resist pressure from the surrounding earth. What type temporary support is this? A. Bracing B. Sheeting C. Underpinning Answer B. It is a type of sheeting. ARE 4.0 exam prep: SPD