How is the duration of submittal review by the architect managed so that it is considered within reasonable promptness?
1. Per amount of time specified in the Owner-Architect Agreement.
2. Amount of time defined in the General Conditions of the Contract for Construction.
3. Allowable time as indicated by Architect in Division 1.
4. Per schedule of submittals included with contractor's construction schedule.
Answer
ARE 4.0 exam prep: CDS

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Vapor retarders

In this section, a ceiling assembly separates the attic space above from the room interior below. If the building is located in Lewisville, Texas (hot-humid zone), where is the predicted location of condensation and what is the predicted condition of the gypsum board in this assembly? (Select 2 from the following) A. outside face of vapor retarder B. inside face of vapor retarder C. gypsum board will be wet D. gypsum board will be dry