Skip to main content

Exit discharge

A fully-sprinklered lobby may serve as the final portion of the means of egress when additional specific conditions are met - connects to a free and unobstructed way to the exterior, entire level of discharge is separated by same fire rated fire-resistive construction from the area below.
Most significantly, what condition must be met regarding occupant load & capacity of the exit?

AnswerExit discharge through intervening spaces is only possible for up to 50% of the number & capacity of the exit enclosures for the building. Thus, the other 50% must connect to the public way without intervening spaces.
ARE 4.0 exam prep: BDCS

Comments

Try These Too!

Overimprovement

While underimprovement describes property that is not being put to its highest and best use (reducing its value), when does overimprovement apply?

Change in services

An owner may authorize a change in services for which a written scope of duties is attached to the owner-architect contract, to provide a higher degree of monitoring or observing work on site than expected under basic construction phase services for architect's site visits. What is this role and when does it occur?

Space programming

What are two common ways to identify and document physical and functional relationships amongst spaces in the programing phase? Choose 2 A. adjacency diagram B. adjacency matrix C. bubble diagramming D. block-stack diagram Answer A & B The adjacency diagram and adjacency matrix are used in programming stage, while C & D are employed as the initial design effort begins as more physical representations of plan are introduced. ARE 4.0 exam prep: PPP