Skip to main content

Erosion & Sedimentation Control

In documenting a LEED project, how many potential credits can be achieved by creating and implementing an Erosion & Sedimentation Control (ESC) Plan for all construction activities associated with the project?
A. 0
B. 1
C. 2
AnswerA. 0, Construction Activity Pollution Prevention is a prerequisite under the sustainable sites category.

ARE 4.0 exam study: SPD

Comments

Try These Too!

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred

Roof pitch

Which one of the following slopes in this illustration corresponds with an 8:12 pitch roof? A. 45° B. 36.87° C. 33.69° D. 26.57°

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors