Erosion & Sedimentation Control

In documenting a LEED project, how many potential credits can be achieved by creating and implementing an Erosion & Sedimentation Control (ESC) Plan for all construction activities associated with the project?
A. 0
B. 1
C. 2
AnswerA. 0, Construction Activity Pollution Prevention is a prerequisite under the sustainable sites category.

ARE 4.0 exam study: SPD

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP