Energy code criteria

Codes often allow prescriptive and performance paths for compliance. An approach that compares a proposed design to a baseline or reference design to demonstrate that the proposed design is at least as efficient as the baseline in terms of annual energy use is an example of what type of path?
A. Prescriptive
B. Performance

AnswerB. Performance

ARE 4.0 exam prep: BS

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP