Delivery methods

What delivery method is defined by the following three characteristics?
1. three prime players: owner, architect, ______
2. two separate contracts: owner-architect, owner-_______
3. final provider selection based on other features, but NOT cost
Use of GMP is typical of this method, but when to set GMP is flexible and varies by project.

AnswerCM@R: Construction Manager At Risk.
See PPP tab for link to AIA Best Practices Articles regarding delivery methods & compensation: BDCS

Comments

Try These Too!

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors