Skip to main content

D.C. beautification

Who served on the Senate Park Commission in 1901 to devise a plan for the beautification of Washington, DC? (Choose 4)
A. Daniel Burnham
B. John W. Root
C. C.F. McKim
D. F.L. Olmsted Jr.
E. Augustus Saint-Gaudens

AnswerA,C,D, and E, but not B.

Read more about designing the nation's capital: http://www.nps.gov/history/history/online_books/ncr/designing-capital/sec1.html

ARE 4.0 exam prep: PPP

Comments

Try These Too!

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors