In pounds per square foot, which of the following materials are ordered correctly from lightest to heaviest?
A. asphalt shingles, 1/2" plywood, 4" wall brick, water
B. suspended acoustical ceiling, steel decking, 1/2" plaster, 5-ply built-up roofing
C. 1/2" gypsum wallboard, 7/8" hardwood floor, earth (moist & packed), water
D. 1/4" glass, 7/8" hardwood floor, 1/2" quarry tile, marble
Answer

Comments

Try These Too!

Space programming

What are two common ways to identify and document physical and functional relationships amongst spaces in the programing phase? Choose 2 A. adjacency diagram B. adjacency matrix C. bubble diagramming D. block-stack diagram Answer A & B The adjacency diagram and adjacency matrix are used in programming stage, while C & D are employed as the initial design effort begins as more physical representations of plan are introduced. ARE 4.0 exam prep: PPP

Overimprovement

While underimprovement describes property that is not being put to its highest and best use (reducing its value), when does overimprovement apply?

Change in services

An owner may authorize a change in services for which a written scope of duties is attached to the owner-architect contract, to provide a higher degree of monitoring or observing work on site than expected under basic construction phase services for architect's site visits. What is this role and when does it occur?