Basic services

Door and window details are first typically included in the deliverables of which basic service phase?
A. Schematic Design
B. Design Development
C. Construction Document
D. Bid Phase
E. Construction Phase

AnswerB. Design Development, in addition to fully dimensioned floor plans, sections and elevations, as well as outline material specifications.

ARE 4.0 exam prep: CDS

Comments

  1. I'm not sure I'm getting this. Door and Window details in my mind are squarely part of CD's.

    ReplyDelete
  2. Yes - true as well. The word "first" should be inserted before "included". The guide for this question is from an AIA Best Practices article found here: http://soloso.aia.org/eKnowledge/Resources/PDFS/AIAP026834?dvid=4294964851

    ReplyDelete

Post a Comment

Try These Too!

Fire-alarm & detection systems

In an atrium connecting 2 or more stories, what device types are generally required per section 907.2.13 of the International Fire Code (IFC)? Answer Fire alarm activated by automatic alarm, fire flow or manual alarm. Further, in Group A, E or M occupancies, emergency voice / alarm communication system is required per 907.2.12.2 (High-rise buildings). ARE 4.0 exam prep: BS

Overimprovement

While underimprovement describes property that is not being put to its highest and best use (reducing its value), when does overimprovement apply?

Stone shape and usage

Which of the following forms of stone is irregular with a minimum of one good face and is used for ashlar veneers, curbs, sills, and copings? A. Monumental stone B. Rubble stone C. Dimension stone D. Rough stone Answer B. Rubble stone. ARE 4.0 exam prep: BDCS