Sanitary drainage

A building's sanitary drainage system continues from the house (building) drain to the house (building) sewer and ultimately to the main sewer line or private disposal system. Where does the house drain end and house sewer begin as commonly designated in local plumbing codes?

A. at exterior envelope of the building
B. at a point 3-5 ft outside the building
C. at a point more than 5 ft outside the building
D. at a point 5 ft inside the property line

AnswerB. at a point 3-5 feet outside of the building. This can vary by municipal ordinance.

ARE 4.0 exam prep: SPD

Comments

Try These Too!

Vertical louvers

On which elevations of a building are vertical louvers generally more effective? Select 2 A. East B. South C. West D. North Answer A. East and C. West (answer applies for northern hemisphere) ARE 4.0 exam prep: SPD

Friction loss

Friction loss or static head in sizing of air ducts is given in this expression of units: A. pounds per square inch B. inches of water per 100 feet C. inches of refrigerant per 100 feet D. inches of water per foot Answer B. inches of water per 100 feet ARE 4.0 exam prep: BS

Joint ventures

Which AIA document series includes agreements for joint ventures? A. A-series B. B-series C. C-series D. D-series E. G-series Answer C. C-series covers architect/consultant documents including joint ventures.