Sanitary drainage

A building's sanitary drainage system continues from the house (building) drain to the house (building) sewer and ultimately to the main sewer line or private disposal system. Where does the house drain end and house sewer begin as commonly designated in local plumbing codes?

A. at exterior envelope of the building
B. at a point 3-5 ft outside the building
C. at a point more than 5 ft outside the building
D. at a point 5 ft inside the property line

AnswerB. at a point 3-5 feet outside of the building. This can vary by municipal ordinance.

ARE 4.0 exam prep: SPD

Comments

Try These Too!

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred

Brick bonds

What distinguishes the English Bond pattern from the Dutch Bond pattern in this image? Answer In the English Bond, stretchers are aligned; In the Dutch (cross), stretchers move by a half each course (not aligned). ARE 4.0 exam prep: BDCS

Collector walks

Walks next to parking areas where vehicles are able to overhang the walk should be a minimum width. What is this minimum in feet? A. 3 feet B. 4 feet C. 5 feet D. 6 feet Answer These walks should be 6 ft (D.) minimum in width. ARE 4.0 exam prep: SPD