IBC requirements

The following is a representative list per IBC section 1701/1704/1707 for a project, of what?
1. structural welding
2. high strength bolting
3. anchor bolts in concrete
4. high load diaphragms
5. grading, excavation and filling
6. pile foundations
7. sprayed fire-resistant materials
8. mech. and elec. components
Answer

Comments

Try These Too!

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors