Initial Decision Maker

The 2007 editions of AIA construction contract forms A101, A102(A111 old) and A201 introduced and defined the term Initial Decision Maker (IDM). The role is designated to make decisions in all matters of dispute between the Owner and the Contractor. These decisions are final and binding, but are also subject to mediation and arbitration. If the IDM is not appointed in the construction agreement, who will serve this function?



Answer: The architect (in the traditional manner of past contract editions).

Comments

Try These Too!

Calculate Luminance

A typical 60-watt standard frosted incandescent bulb outputs 890 lumens for an efficacy ratio of about 15 lumens per watt. As an A19, its shape is spherical. What is the its calculated luminance? A. 25,115 cd/in² B. 25.115 cd/ft² C. 25,115 cd/m² D. Indeterminate, missing variable. Answer If 1 candela (cd) = 4 ∏ lumens (lm), 890 x 1cd/4∏ = 71 cd, A19 = 19/8 = 2.375 in or 60mm diameter (= 30mm radius), L = intensity / projected area, 71 cd / ∏ r² = 71/ 3.14 x (.03m)² = 25,115 cd/m² ARE 4.0 exam prep: BS

Characteristics of form

Which example illustrates a regular ordering of elements producing RHYTHM? A B C D Answer Answer is C. A = proportion, B = symmetry, D = balance ARE 4.0 exam prep: PPP

Roof pitch

Which one of the following slopes in this illustration corresponds with an 8:12 pitch roof? A. 45° B. 36.87° C. 33.69° D. 26.57°