Sustainable construction process

Although a project attempting to meet LEED requirements for VOC limits in paints, coatings and adhesives has called for specific content limits in all applicable project specifications, what is an easily overlooked set of products that may jeopardize compliance with VOC limits in the project?



Answer: Touch-ups are often made with incorrect products because the amounts are small, but the presence on the jobsite of non-compliant products can jeopardize credits concerned with low-emitting materials.
are-review.blogspot.com

Comments

Try These Too!

Parking units

What are the car stall dimensions for a compact car? Answer A compact car stall size can be set by each municipality and therefore varies. Generally it is 7ft 6in wide by 15ft 0in long. However, in Fresno CA it's 8 1/2ft x 16ft and according to an Iowa urban design manual, it's 7ft 6in by 16ft. ARE 4.0 exam prep: SPD

Townships double post!

How many sections are contained within a township? Answer 36 (each is 1 mile square) What are the dimensions of 1/2 of a township? H & W Answer 18 miles square (3x6 sections) ARE 4.0 exam prep: SPD

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors