Sustainable construction process

Although a project attempting to meet LEED requirements for VOC limits in paints, coatings and adhesives has called for specific content limits in all applicable project specifications, what is an easily overlooked set of products that may jeopardize compliance with VOC limits in the project?



Answer: Touch-ups are often made with incorrect products because the amounts are small, but the presence on the jobsite of non-compliant products can jeopardize credits concerned with low-emitting materials.
are-review.blogspot.com

Comments

Try These Too!

Vertical louvers

On which elevations of a building are vertical louvers generally more effective? Select 2 A. East B. South C. West D. North Answer A. East and C. West (answer applies for northern hemisphere) ARE 4.0 exam prep: SPD

Friction loss

Friction loss or static head in sizing of air ducts is given in this expression of units: A. pounds per square inch B. inches of water per 100 feet C. inches of refrigerant per 100 feet D. inches of water per foot Answer B. inches of water per 100 feet ARE 4.0 exam prep: BS

Joint ventures

Which AIA document series includes agreements for joint ventures? A. A-series B. B-series C. C-series D. D-series E. G-series Answer C. C-series covers architect/consultant documents including joint ventures.