Sustainable construction process

Although a project attempting to meet LEED requirements for VOC limits in paints, coatings and adhesives has called for specific content limits in all applicable project specifications, what is an easily overlooked set of products that may jeopardize compliance with VOC limits in the project?



Answer: Touch-ups are often made with incorrect products because the amounts are small, but the presence on the jobsite of non-compliant products can jeopardize credits concerned with low-emitting materials.
are-review.blogspot.com

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP