Skip to main content

Hurricane intensity

What is the preferred preliminary measure of hurricane intensity?
A. Modified Mercalli Intensity scale, B. "mean recurrence interval" or "return period" of 50-year storm, C. Saffir-Simpson scale, D. Richter scale



Answer is C. Saffir-Simpson scale - based on post-storm assessments (observation) and anemometer instrument readings.
are-review.blogspot.com

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP