Skip to main content

Contractor responsibilities

According to A201 General Conditions of the Contract, which of the following is the contractor NOT obligated to keep at the job site?
A. drawing set, B. specifications, C. bidding documents, D. addenda, E. samples



Answer is C. bidding documents are not required and are not part of the contract documents, unlike bidding package items (A, B, D) which are included in the contract documents.
are-review.blogspot.com

Comments

Try These Too!

Structural forces

Choose a term that best identifies the type of force shown in this diagram - A. collinear B. concurrent C. nonconcurrent D. noncoplanar

Roof pitch

Which one of the following slopes in this illustration corresponds with an 8:12 pitch roof? A. 45° B. 36.87° C. 33.69° D. 26.57°

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred