According to A201 General Conditions of the Contract, which of the following is the contractor NOT obligated to keep at the job site?
A. drawing set, B. specifications, C. bidding documents, D. addenda, E. samples



Answer is C. bidding documents are not required and are not part of the contract documents, unlike bidding package items (A, B, D) which are included in the contract documents.
are-review.blogspot.com

Comments

Try These Too!

Calculate Luminance

A typical 60-watt standard frosted incandescent bulb outputs 890 lumens for an efficacy ratio of about 15 lumens per watt. As an A19, its shape is spherical. What is the its calculated luminance? A. 25,115 cd/in² B. 25.115 cd/ft² C. 25,115 cd/m² D. Indeterminate, missing variable. Answer If 1 candela (cd) = 4 ∏ lumens (lm), 890 x 1cd/4∏ = 71 cd, A19 = 19/8 = 2.375 in or 60mm diameter (= 30mm radius), L = intensity / projected area, 71 cd / ∏ r² = 71/ 3.14 x (.03m)² = 25,115 cd/m² ARE 4.0 exam prep: BS

Characteristics of form

Which example illustrates a regular ordering of elements producing RHYTHM? A B C D Answer Answer is C. A = proportion, B = symmetry, D = balance ARE 4.0 exam prep: PPP

Roof pitch

Which one of the following slopes in this illustration corresponds with an 8:12 pitch roof? A. 45° B. 36.87° C. 33.69° D. 26.57°