Contractor responsibilities

According to A201 General Conditions of the Contract, which of the following is the contractor NOT obligated to keep at the job site?
A. drawing set, B. specifications, C. bidding documents, D. addenda, E. samples



Answer is C. bidding documents are not required and are not part of the contract documents, unlike bidding package items (A, B, D) which are included in the contract documents.
are-review.blogspot.com

Comments

Try These Too!

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred

Brick bonds

What distinguishes the English Bond pattern from the Dutch Bond pattern in this image? Answer In the English Bond, stretchers are aligned; In the Dutch (cross), stretchers move by a half each course (not aligned). ARE 4.0 exam prep: BDCS

Collector walks

Walks next to parking areas where vehicles are able to overhang the walk should be a minimum width. What is this minimum in feet? A. 3 feet B. 4 feet C. 5 feet D. 6 feet Answer These walks should be 6 ft (D.) minimum in width. ARE 4.0 exam prep: SPD