Skip to main content

Basic Services

As outlined in B101 (owner-architect agreement, article 3), which of the following are usual and customary services included in the Architect's Basic Services? choose 3
A. mechanical
B. structural
C. electrical
D. civil engineering
E. existing facilities surveys
Answerusual and customary A. mechanical, B. structural, and C. electrical services are part of the Architect's Basic Services. Civil and existing facilities surveys are additional services.
ARE 4.0 exam prep: CDS

Comments

Try These Too!

Moisture content in wood

The amount of shrinkage, weight, strength, and withdrawal resistance of nails is affected by the moisture content in wood. Wood that is grademarked kiln dry has a maximum moisture content of: A. 15% B. 19% C. 25% D. 30% Answer A. 15%. Dry lumber moisture content cannot exceed 19%. ARE 4.0 exam prep: SS

Fire-alarm & detection systems

In an atrium connecting 2 or more stories, what device types are generally required per section 907.2.13 of the International Fire Code (IFC)? Answer Fire alarm activated by automatic alarm, fire flow or manual alarm. Further, in Group A, E or M occupancies, emergency voice / alarm communication system is required per 907.2.12.2 (High-rise buildings). ARE 4.0 exam prep: BS

Zoning terminology

What is the term for the maximum three-dimensional space on a zoning lot within which a structure can be built, as allowed by applicable height, setback and yard controls? Answer Zoning envelope or building envelope.