Wall / ceiling finishes

Match the flame spread and smoke developed index values with the corresponding wall & ceiling finish class:
flame spread 0-25
flame spread 26-75
flame spread 76-200
smoke developed 0-100
smoke developed 0-450
smoke developed >500

Class A =
Class B =
Class C =

AnswerA=flame 0-25, smoke 0-450; B=flame26-75, smoke 0-450; C=flame 76-200, smoke 0-450

ARE 4.0 exam prep: BCDS

Comments

Try These Too!

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors