Document conformance

An architecture firm that is implementing a quality control program during construction documents phase would incorporate which of the following procedures:
A. have individuals outside the project team confirm that documentation comply with in-house quality standards.
B. have individual members of the project design team verify that documentation conforms with in-house quality standards.
C. assess previous projects through total quality management for keys to improvement
D. implement an ISO 9000 audit.

AnswerA. is correct. QC is intended to examine whether QA processes have been performed. TQM refers to a process of continuous improvement. ISO 9000 are quality standards that relate to a quality management system, sometimes necessary for international practice.

ARE 4.0 exam prep: PPP

Comments

Try These Too!

Townships double post!

How many sections are contained within a township? Answer 36 (each is 1 mile square) What are the dimensions of 1/2 of a township? H & W Answer 18 miles square (3x6 sections) ARE 4.0 exam prep: SPD

Parking units

What are the car stall dimensions for a compact car? Answer A compact car stall size can be set by each municipality and therefore varies. Generally it is 7ft 6in wide by 15ft 0in long. However, in Fresno CA it's 8 1/2ft x 16ft and according to an Iowa urban design manual, it's 7ft 6in by 16ft. ARE 4.0 exam prep: SPD

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%