Document conformance

An architecture firm that is implementing a quality control program during construction documents phase would incorporate which of the following procedures:
A. have individuals outside the project team confirm that documentation comply with in-house quality standards.
B. have individual members of the project design team verify that documentation conforms with in-house quality standards.
C. assess previous projects through total quality management for keys to improvement
D. implement an ISO 9000 audit.

AnswerA. is correct. QC is intended to examine whether QA processes have been performed. TQM refers to a process of continuous improvement. ISO 9000 are quality standards that relate to a quality management system, sometimes necessary for international practice.

ARE 4.0 exam prep: PPP

Comments

Try These Too!

AIA Code of Ethics & Professional Conduct

The Code consists of three tiers of statements. Match them with an intent: I   Canon II  Ethical Standard III Rule of Conduct a: specific goals, which Members should strive to meet in professional performance b: mandatory, a violation of which is grounds for disciplinary action by the AIA c: broad principles of conduct Answer Ic, IIa, IIIb ARE 4.0 exam prep: PPP

Zoning terminology

What is the term for the maximum three-dimensional space on a zoning lot within which a structure can be built, as allowed by applicable height, setback and yard controls? Answer Zoning envelope or building envelope.

Structural Tee

Two types of structural tee shapes are "WT" and "ST" shapes. How are these two different shapes derived? Answer WTs are cut from wide-flange sections (W shapes). STs are cut from American Standard I-beams (S shapes). ARE 4.0 exam prep: SS