An architecture firm that is implementing a quality control program during construction documents phase would incorporate which of the following procedures:
A. have individuals outside the project team confirm that documentation comply with in-house quality standards.
B. have individual members of the project design team verify that documentation conforms with in-house quality standards.
C. assess previous projects through total quality management for keys to improvement
D. implement an ISO 9000 audit.

AnswerA. is correct. QC is intended to examine whether QA processes have been performed. TQM refers to a process of continuous improvement. ISO 9000 are quality standards that relate to a quality management system, sometimes necessary for international practice.

ARE 4.0 exam prep: PPP

Comments

Try These Too!

Bidding process

If the Owner would like to change the designated bid opening date and time contained in the Instructions to Bidders for the Owner's convenience, what procedure must be used? Answer

Tensegrity

A type of structure whose integrity is derived from the balance between members in tension and in compression is Tensegrity . Compressive components connected by tensile components to other compressive components form a tensegrity structure. What architect-engineer-cosmologist coined this term? Answer

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP