Skip to main content

Space Diagrams





















In this bubble diagram, which of the following is true? (Choose 2)

A. Following meetings, the staff may return directly to the open studio.
B. Visitors do not need to see reception before accessing the meeting room.
C. Accounts officers must pass through the open studio to exit.
D. The majority of the office staff have direct access to the pantry.
E. Following meetings, staff may return directly to the director's office.

AnswerC and E are true. All others are false statements.

ARE 4.0 exam prep: PPP

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Shoring

A slurry wall is a narrow trench filled with a slurry mixture composed of bentonite clay and water, enabling it to resist pressure from the surrounding earth. What type temporary support is this? A. Bracing B. Sheeting C. Underpinning Answer B. It is a type of sheeting. ARE 4.0 exam prep: SPD

Spec coordination

In case there is a discrepancy between specifications and the drawings, which takes precedence? Answer Neither, A201 considers these - quote - complementary and what is required by one shall be binding as if required by all.- unquote. ARE 4.0 exam prep: CDS