LEED risk management

As a document intended to be an attachment or addendum to a B101 contract between owner and architect, B214-2007 outlines duties and responsibilities concerning LEED certification. This includes providing specifications incorporating LEED requirements in the Contract Documents and conducting a pre-bid meeting to review LEED principles, procedures and requirements for the project. With respect to the contractor, when does B214 consider identification of LEED goals?

AnswerIn B214, a project's LEED goals are presumed to be identified before a bid is ever submitted by a contractor.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Vertical louvers

On which elevations of a building are vertical louvers generally more effective? Select 2 A. East B. South C. West D. North Answer A. East and C. West (answer applies for northern hemisphere) ARE 4.0 exam prep: SPD

Friction loss

Friction loss or static head in sizing of air ducts is given in this expression of units: A. pounds per square inch B. inches of water per 100 feet C. inches of refrigerant per 100 feet D. inches of water per foot Answer B. inches of water per 100 feet ARE 4.0 exam prep: BS

Joint ventures

Which AIA document series includes agreements for joint ventures? A. A-series B. B-series C. C-series D. D-series E. G-series Answer C. C-series covers architect/consultant documents including joint ventures.