LEED risk management

As a document intended to be an attachment or addendum to a B101 contract between owner and architect, B214-2007 outlines duties and responsibilities concerning LEED certification. This includes providing specifications incorporating LEED requirements in the Contract Documents and conducting a pre-bid meeting to review LEED principles, procedures and requirements for the project. With respect to the contractor, when does B214 consider identification of LEED goals?

AnswerIn B214, a project's LEED goals are presumed to be identified before a bid is ever submitted by a contractor.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Spec coordination

In case there is a discrepancy between specifications and the drawings, which takes precedence? Answer Neither, A201 considers these - quote - complementary and what is required by one shall be binding as if required by all.- unquote. ARE 4.0 exam prep: CDS

Shoring

A slurry wall is a narrow trench filled with a slurry mixture composed of bentonite clay and water, enabling it to resist pressure from the surrounding earth. What type temporary support is this? A. Bracing B. Sheeting C. Underpinning Answer B. It is a type of sheeting. ARE 4.0 exam prep: SPD