LEED risk management

As a document intended to be an attachment or addendum to a B101 contract between owner and architect, B214-2007 outlines duties and responsibilities concerning LEED certification. This includes providing specifications incorporating LEED requirements in the Contract Documents and conducting a pre-bid meeting to review LEED principles, procedures and requirements for the project. With respect to the contractor, when does B214 consider identification of LEED goals?

AnswerIn B214, a project's LEED goals are presumed to be identified before a bid is ever submitted by a contractor.

ARE 4.0 exam prep: CDS

Comments

Try These Too!

Overimprovement

While underimprovement describes property that is not being put to its highest and best use (reducing its value), when does overimprovement apply?

Change in services

An owner may authorize a change in services for which a written scope of duties is attached to the owner-architect contract, to provide a higher degree of monitoring or observing work on site than expected under basic construction phase services for architect's site visits. What is this role and when does it occur?

Stone shape and usage

Which of the following forms of stone is irregular with a minimum of one good face and is used for ashlar veneers, curbs, sills, and copings? A. Monumental stone B. Rubble stone C. Dimension stone D. Rough stone Answer B. Rubble stone. ARE 4.0 exam prep: BDCS