AIA G715 - 1991

Which party is responsible for completing the form AIA G715 Supplemental Attachment for Acord Certificate of Insurance?
1. Owner
2. Architect
3. Contractor

Answer3. Contractor (or rather Contractor's insurance representative.) G715 is attached to the Acord Certificate, which lacks the space to summarize all the coverages required in A201, General conditions.

ARE 4.0 exam prep: CDS

For a current listing of AIA Contract Administration and Project Management Forms see this link to the AIA

Comments

Try These Too!

Bolted connections

What is the minimum spacing of bolts specified by AISC? and preferred spacing? A. 1 1/4 times the diameter of the bolt; 2 times preferred B. 1 3/4 times the diameter of the bolt; 2 1/4 times preferred C. 2 1/3 times the diameter of the bolt; 2 2/3 times preferred D. 2 2/3 times the diameter of the bolt; 3 times preferred E. 3 times the diameter of the bolt; 3.25 times preferred

Brick bonds

What distinguishes the English Bond pattern from the Dutch Bond pattern in this image? Answer In the English Bond, stretchers are aligned; In the Dutch (cross), stretchers move by a half each course (not aligned). ARE 4.0 exam prep: BDCS

Collector walks

Walks next to parking areas where vehicles are able to overhang the walk should be a minimum width. What is this minimum in feet? A. 3 feet B. 4 feet C. 5 feet D. 6 feet Answer These walks should be 6 ft (D.) minimum in width. ARE 4.0 exam prep: SPD